Exercises · Grade 12
Network flows and project scheduling — Grade 12 math exercises
Open an exercise and the tutor guides you step by step: it asks questions and checks each step, without giving the answer.
- Exercise 1 — Check capacities and conservation (easy)
- Exercise 2 — Certify a maximum flow with a cut (easy)
- Exercise 3 — Identify which capacity upgrade matters (easy)
- Exercise 4 — Use a reverse residual edge to revise a flow (medium)
- Exercise 5 — Reassign jobs and detect a matching obstruction (medium)
- Exercise 6 — Minimize the cost of a complete assignment (medium)
- Exercise 7 — Reduce a transportation model to one variable (medium)
- Exercise 8 — Compute a project duration from precedence (hard)
- Exercise 9 — Calculate latest times and avoid double-spending float (hard)
- Exercise 10 — Allocate a task-reduction budget (hard)